// Q2 2026 · Public Summary

Nuclear PPA Price Index Q2 2026

v1.0 baseline · Publication target July 15, 2026 · Data through 2026-04-22
$97 / MWh
+18% YoY · ±$10 confidence band
Q2 2026 US nuclear PPA weighted average across 5 main-index deals (Q≥3) totaling 7,100 contracted MW.

Up approximately +18% year-over-year vs a reconstructed Q2 2025 baseline of ~$82/MWh. The move reflects three 20-year hyperscaler PPAs signed in the trailing twelve months plus the Duane Arnold restart agreement, all of which priced above the pre-2024 wholesale-plus-capacity clearing band that nuclear merchants had historically received.

For context: before 2024, large merchant nuclear fleets (Talen Susquehanna, Vistra PJM plants) operated at all-in costs below $24/MWh while earning energy + capacity revenue in the $45–65/MWh range. Illinois Clinton relied on a zero-emission credit to bridge the gap. Today's $95–110/MWh hyperscaler pricing represents a structural repricing of baseload carbon-free electrons — driven entirely by AI data-center demand pull.

Contract-type decomposition

SegmentWeighted $/MWhNote
Existing fleet, operating$95AWS-Talen, Meta-Constellation Clinton, Meta-Vistra PJM
Existing fleet, restart$106MSFT-Constellation TMI, Google-NextEra Duane Arnold
SMR (forward-start)n/dNo Q≥3 pricing disclosed; third-party range $65–100/MWh
New large build (AP1000)n/dNo signed PPAs; DOE/MIT projects $78–97/MWh LCOE with IRA

Restart premium over operating-fleet PPAs: ~$11/MWh, a rational spread given $1.6–2.0B restart capex amortized over 20–25 year terms.

ISO breakdown

ISODealsContracted MWWeighted $/MWh
PJM35,364$95
MISO21,736$103
ERCOT1 (Vistra-Comanche Peak, undisclosed)1,200n/d

Top 3 market-moving deals (trailing 12 months)

NoteDealPlantMWTermDate
Largest uprate-inclusive PPA in US corporate-nuclear historyMeta → VistraPerry + Davis-Besse + Beaver Valley2,60920yrJan 9, 2026
First grid-connected "IPP model" post-FERC BTM rejectionAWS → TalenSusquehanna1,92017yrJun 11, 2025
First "replace-the-subsidy" template (Illinois ZEC transition)Meta → ConstellationClinton1,12120yrJun 3, 2025

What moved the market this quarter

  1. Q1 2026 closed with Meta's January 9 triple-deal (Vistra + TerraPower + Oklo totaling 6.6 GW) — the single largest corporate nuclear procurement announcement in history, anchoring PJM pricing for the next 20 years.
  2. Google-NextEra Duane Arnold (Oct 2025) confirmed restarts have a repeatable economic model beyond TMI. Analyst consensus now treats restart PPAs as a distinct $100–115/MWh segment with its own deal flow.
  3. AWS-Dominion North Anna PPA (reported by secondary industry trackers in Feb 2026) remains unverified in primary filings and is excluded from the main index pending Dominion disclosure.
  4. FERC's final rejection of the Talen-AWS amended ISA in April 2025 closed off behind-the-meter co-location as a legally durable structure in PJM. The grid-connected restructure (June 2025) is now the industry template.
  5. SMR offtake deals continue to proliferate but none disclose $/MWh, keeping the SMR sub-index in "not disclosed" status through Q2 2026 despite over 10 GW of announced commitments.

What the detail tier ($35K/yr) shows this quarter

  • Full pricing decomposition (capacity, energy, REC, escalator) for all Q≥3 deals
  • 17-deal ledger including 9 watch-list deals (Q=1–2)
  • Back-calculation workpapers: how Jefferies' $785M/yr Constellation revenue estimate maps to a $112/MWh implied TMI price; how Talen's $1.4B/yr full-ramp revenue implies ~$89.50/MWh across 1,920 MW
  • Region-by-region breakdown including PJM zone-level splits
  • 5-year forward curve with scenario analysis (base / high-AI / slow-AI)
  • Deal tracker with 72-hour updates via REST API
  • Q2 2026 analyst commentary (expected 6–8 page PDF at publication)

Methodology trust signals

MetricQ2 2026
Data quality score this quarter72 / 100
Deals included in main index5 (Q≥3)
Total contracted MW in main index7,100 MW
Watch-list deals (Q≤2)9 (see detail tier)
Outliers flagged separately0
Corrections from prior quarterv1.0 baseline — none
Disclosed $/MWh share0% (all analyst-inferred or back-calculated)

The 0% directly-disclosed share is the industry's single biggest pricing opacity problem and the core reason NPPI exists. As more buyers and sellers file SEC disclosures with pricing detail (particularly AWS-Talen in Talen's 10-K filings and Meta in Constellation/Vistra 8-Ks), this share will rise.


Subscribe for Q3 2026 early access + full deal ledger: intelligence@reactorn.com

Next release: October 15, 2026 (Q3 2026 data)

Full methodology: PPA Index Methodology v1.0 →

Sources (primary filings, press releases, analyst notes)

  1. Constellation Energy, "Constellation to Launch Crane Clean Energy Center" (Sept 20, 2024)
  2. Bloomberg / Jefferies analyst estimates of MSFT-Constellation PPA pricing (Sept 25, 2024)
  3. Kairos Power + Google Master Plant Development Agreement release (Oct 14, 2024)
  4. Amazon + Energy Northwest + X-energy Cascade release (Oct 16, 2024)
  5. FERC order rejecting Talen-AWS ISA amendment (Nov 1, 2024; re-affirmed April 10, 2025)
  6. Constellation-Meta 20-year Clinton PPA release (June 3, 2025)
  7. Talen Energy Globe Newswire: expanded 1,920 MW AWS PPA (June 11, 2025)
  8. Vistra 2025-09 Form 8-K (Comanche Peak 1,200 MW PPA)
  9. NextEra Energy + Google Duane Arnold restart release (Oct 27, 2025)
  10. Holtec Palisades DOE LPO loan + Wolverine/Hoosier PPA disclosures (2024–2025)
  11. TerraPower + Meta 8-unit Natrium agreement release (Jan 9, 2026)
  12. Vistra Form 8-K + Vistra-Meta PJM release (Jan 9, 2026)
  13. DOE Pathways to Commercial Liftoff: Advanced Nuclear (Nov 2023 + 2024 update)
  14. MIT CANES 2024 Total Cost Projection of Next AP1000

Detail-tier subscribers receive full URL citations and back-calculation workpapers.

REACTOR N · INTELLIGENCE · NOT A SUBSTITUTE FOR NRC GUIDANCE OR LICENSED ENGINEERING COUNSEL