Data centers are now the largest buyer of US nuclear power. This is the demand-meets-supply map: per-grid data-center load pipeline against firm generation, power-stranded vs power-rich rankings, and which firm nuclear supply is still seeking load — anchored to Reactor N's live reactor fleet.

[EC.0]

National Convergence Index

Data-center demand vs firm generation across US grids

[EC.1]

ISO Convergence Scoreboard

DC load pipeline vs firm generation in queue · convergence (tension) score 0–100 · sorted by power gap

Grid / ISO DC Pipeline Firm Gen Gap D:S Convergence Score Interconnect Classification

[EC.2]

Power-Stranded vs Power-Rich

Where AI demand outruns firm supply — and where firm supply is waiting for load.

Most Power-Stranded

Demand >> firm supply · highest tension

Most Balanced / Power-Rich

Firm supply keeping pace · DC-attractive
[EC.3]

Restart → Data-Center Matching

The supply–demand graph: contracted nuclear↔DC pairs, plus firm supply seeking load and demand seeking firm supply.

Contracted pairs

Firm nuclear supply → named data-center offtaker

Firm supply seeking load

Restarts / SMRs not yet contracted to a DC — the investable signal

Large demand seeking firm supply

Grid/gas-dependent DC load in tight regions — candidates for nuclear offtake
[EC.3b]

Supply Mix, Sourcing Strategy & the 45U Floor

How the firm nuclear pipeline breaks down, how data centers are sourcing power, and the policy floor under nuclear economics.

Firm nuclear pipeline by type

restart · SMR · uprate · new build

How DCs source power

grid (FTM) vs behind-the-meter / SMR / gas

Contracted vs merchant

firm nuclear adds already tied to a DC

[EC.4]

Data-Center Demand Pipeline

Public large-scale data-center load (≥100 MW) · weighted by interconnection-realization probability

Operator Campus Grid Load Power strategy Status Realize
[EC.5]

Methodology & Sources

01 · Demand

Public data-center load pipeline (≥100 MW) from company announcements, hyperscaler PPAs, ISO large-load study requests, and state PUC filings — weighted by interconnection-realization probability.

02 · Grid constraint

Per-ISO interconnection queue context: data-center load pipeline, firm dispatchable generation in queue, average interconnection time, and historical queue withdrawal rates.

03 · Supply (live)

Firm nuclear additions — restarts, SMRs, new builds, uprates — anchored to Reactor N's live US operating fleet via NRC Power Reactor Status, refreshed daily.

04 · Convergence score

Tension index (0–100) = 0.6×(demand÷firm supply) + 0.25×interconnect latency + 0.15×queue attrition, scaled across grids.